Skip to content

Independent service. Not a government website.

FindTendersFindTenders

Site clearance dressing fo site for work,Earthwork excavation in continuous wall foundation trench,

Key dates

  1. Published

    03 Nov 2026, 01:22 PM IST

  2. Bid submission starts

    03 Nov 2026, 01:22 PM IST

  3. Bid submission ends

  4. Bids open

    15 Nov 2026, 02:00 PM IST

Eligibility and documents required

Turnover, experience and document requirements have been read from this tender's documents. Free with an account.

Work description

733 × Site clearance dressing fo site for work , Earthwork excavation in continuous wall foundation trench , Sand filling below wall foundation watered and consolidated , brick flat soling by old brick class 2 , RCC in continuous KP plinth beam 250 mm wide x 1 ft deep , Providing and laying brickwork with sub class B burnt clay bricks straight or curved on plan exceeding 6 m , Rendering 12mm thick on fair faces of brick work or concrete surfaces in 1 6 cement mortar , Providing and fixing table rubbed and polished granite of approved type and shade 20 mm thick in steps platforms and pigment to match the granite shade complete , ornamnetal light pole of 6m height with lights and all fitting , Providing fabricating and fixing framed mild steel work such as grills framed balusters and railings , Supply installation testing and commissioning of ornamental clock Designing supplying fabricating constructing , plain cement concrete in foundation and floor by 1 2 4 type B2 , Surfaces of any description not otherwise described over 10cm width or girth , reflective sheets of direction indication over the ornamental pole of 15 feet height

Tender documents

  • GEM-2026-B-8233573.pdfGeM bid document

Download documents here with a free account, or from the portal itself. Create free account

Tender details

Tender ID
GEM/2026/B/8233573
Portal
Government e-Marketplace (GeM)
Tender type
GeM Bid
Form of contract
Total value wise evaluation
Product category
Site clearance dressing fo site for work,Earthwork excavation in continuous wall foundation trench,